Stone mechanical assembly process need to pay attention to m

Machinery and equipment manufacturing enterprises to ensure the quality of stone machinery products, assembly, must be in accordance with the provisions of a variety of stone machinery product assembly technical requirements to operate. According to the common assembly of several types of mechanical equipment, we summarized the following precautions.

1, do a good job cleaning and cleaning parts. Cleaning operations include removal of residual cast sand, rust, chips and so on. In particular, some important parts, such as gantry cutting machine, cavity should be coated with anti-rust paint. Parts of the oil, rust or attached chips can be diesel, kerosene or gasoline as a washing liquid for cleaning, and then dry with compressed air.

2, match the surface in the match or before the connection, generally need to add lubricant. Especially in the spindle part of the bearing parts, lifting mechanism of the screw nut parts.

3, matching parts with the size to be accurate, the assembly should be with the size of the re-examination or sampling. For example: the shaft of the journal and bearing with the site, the spindle box and the bearing with the hole and its center distance.

4, the wheels of the assembly, requiring two-axis wheel axis must be in the same plane, and parallel to each other, should ensure that there is a normal tooth gap, while axial dislocation ≤ 2MM.

5, the joint surface should be checked whether the formation of flat, with or without deformation, or should be trimmed to remove the burr, to ensure that the contact surface close contact, flat, not skew.

6, the seal should be parallel into the sealing groove, can not twist deformation, damage scratching the sealing surface.

7, the pulley assembly requirements are two pulley shaft must be parallel, the center of the groove should be positive, offset over the General Assembly so that the pulley tension is uneven, resulting in belt slip and accelerated wear. Simultaneous V-belt assembly should be fitted before the length should be consistent, to prevent vibration in the drive.

8, before the assembly of the bearing should be cleaned, remove the anti-rust paint before assembly; cleaning should pay attention to check the raceway and rolling body with or without corrosion, rotation is flexible; bearing assembly should be coated with a layer of lubricating oil, When the pressure is not too much difference, should stop the assembly to check; bearing assembly, no model of the end should be in the direction, by the shoulder direction; set bearing when the force of the size, direction, location should be appropriate, Rolling force, should be symmetrical beating, not slam, to ensure that the end of the vertical axis and to prevent the installation of tilt.

9, threaded connection should be used to prevent the device, according to the actual situation and design requirements of the following commonly used anti-loose device: double nuts loose; spring washers loose; open pin anti-loose; stop washers loose round nuts and flower mat , Symmetrical multiple bolt tightening method should be used to gradually tighten the order of symmetry, the bar connector should be symmetrical from the middle to the two sides gradually tightened. The tail of the ribs to be bolted should protrude the nut.

10, do side inspection side inspection.

11, do a good job driving the pre-check work. For example, check the completeness of the assembly work, the accuracy and reliability of each connection, the flexibility of the movement of the movement, the normalness of the lubrication system, and so on.

12, do a good job in the start of the monitoring process. After the machine starts, should immediately observe the main working parameters and whether the normal movement of sports parts. The main operating parameters include the speed of movement, the smoothness of the movement, the spindle rotation, lubricating oil pressure and, temperature, vibration and noise. Only when the start of the campaign indicators of normal, stable, can try to run.

13, according to a variety of stone mechanical products acceptance conditions for trial operation, testing the relevant projects. For example: the knife speed and stroke adjustment and testing, lift movement stroke adjustment, spindle rotation accuracy test.

Quality stone machinery, is to process a higher quality products to ensure.
主站蜘蛛池模板: 超碰国产亚洲人人| YELLOW在线观看高清视频免费| 人妻激情综合久久久久蜜桃| 热久久视久久精品2015| 最近日本字幕免费高清| 超碰97av 在线人人操| 米奇影视999| 哇嘎在线精品视频在线观看| 夜夜穞狠狠穞| 成人免费公开视频| 久久91精品国产91久久户| 嫩小性性性xxxxbbbb| 亚洲AV无码A片在线观看蜜桃| 中文字幕一区久久久久| 久爱精品亚洲电影午夜| 一本大道香蕉中文在线视频观看| 好看的电影网站亚洲一区| 热九九99香蕉精品品| J午夜精品久久久久久毛片| 久久re视频精品538在线| 日本红怡院亚洲红怡院最新| 印度人XXx| 国产精品第3页| 任你懆视频 这里只有精品| 99热这里只有精品9| 久久久久国产一级毛片高清片| 天天射天天干天天插| 99视频免费在线观看| 日本888 xxxx| 国产露脸A片国语露对白| 欧美精品九九99久久在观看| 用快播看av的网站| 免费在线观看a视频| 24小时日本高清免费看| 国产乱人视频在线观看| 亚洲人女同志video| 国产精品亚洲国产三区| 亚洲激情网站| 国产在线观看www| 天天摸夜添狠狠添高| 久久极品视频|